Sign In | Join Free | My burrillandco.com
Home > 300 BPH Gallon Water Plant >

Double Row Rinsing SUS304 300 BPH Gallon Water Plant

    Buy cheap Double Row Rinsing SUS304 300 BPH Gallon Water Plant from wholesalers
     
    Buy cheap Double Row Rinsing SUS304 300 BPH Gallon Water Plant from wholesalers
    • Buy cheap Double Row Rinsing SUS304 300 BPH Gallon Water Plant from wholesalers
    • Buy cheap Double Row Rinsing SUS304 300 BPH Gallon Water Plant from wholesalers
    • Buy cheap Double Row Rinsing SUS304 300 BPH Gallon Water Plant from wholesalers
    • Buy cheap Double Row Rinsing SUS304 300 BPH Gallon Water Plant from wholesalers

    Double Row Rinsing SUS304 300 BPH Gallon Water Plant

    Ask Lasest Price
    Brand Name : FILL PACK
    Model Number : QGF-300
    Certification : CE, ISO9001
    Price : USD $6000/set
    Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
    Supply Ability : 20 sets/month
    Delivery Time : 15-20 working days
    • Product Details
    • Company Profile

    Double Row Rinsing SUS304 300 BPH Gallon Water Plant

    QGF-300 gallon bottling machine with double row rinsing and filling in SUS304 material


    The gallon bottling machine is integrated washing filling and capping together.

    It is ideal machine to produce barrel water.

    The whole gallon bottling machine is using stainless steel 304 ,rot resistant,can be cleaned easily.

    Main electric parts are all branded. Air channel system use Air TAC brand product.

    The gallon bottling machine is with compact construction,will occupy small room,working efficiency is high.

    Only need 2 operators to control, is a good choice for factory to choose.

    The gallon bottling machine set up do not need plug floor screw,after case taking off,set the gallon bottling machine on the flat floor,and then adjust stand height and adjust all stand pressure to be average.

    After the gallon bottling machine is set up well, get in through water pipe, drain pipe and power , air power.


    Working process:

    gallon bottling machine can be divided into 3 steps: washing, filling and capping, total 36 working stations,working process as below:

    1) Set empty barrel mouth to barrel seat, empty barrel will be washed during headstand situation,4 working station for barrel inserting.

    2) Washing process will be divided into 4 steps:

    1, hot alkali water washing 2,thimerosal washing; 3,clean water washing,4,pure water washing.Every washing step is set to 8S,after washing,there will be 10S for dripping.

    3) The barrel after washing will move down 45 degree through the passing chain and will passing out chain and turn over 45 degree by barrel lift cylinder to filling position for filling.

    4) Filling value will driven by cylinder to insert into barrel and start to fill, filling time is controlled by PLC, and filling time is adjustable by control panel according to filling liquid surface.

    After filling, the extra water will back to pure water tank by automatic vent,it can reduce water consumption.(water tank is not included)

    5) After filling process finish,the filled barrel will be pushed to capping position by barrel stop cylinder,the whole process finish till now.



    Spare parts for free:

    Sealing ring for filling valves*1suit


    Recommended Spare parts list:

    NO.ItemsQty.Price(USD)
    1Sealing ring for filling valves1suitFor free
    2Bucket holder2pcs6.8
    3Cap pressing mould1pcs5
    4Air switch1pcs17
    5Contactor1pcs14
    6Solenoid valve1pcs27

    Parameters:

    CylinderAir tech-Taiwan
    Magnetic valveAir tech-Taiwan
    Rising pump-filling pumpNanfang
    MotorTWT Taiwan
    PLCMitsubishi Japanse
    Power5.3KW
    Dimension3400*1000*1750mm
    Weight500kg

    Packing & Delivery

    1. the gallon bottle water filling machine is packed by wooden case.
    2. The delivery date of gallon bottle water filling machine is within 30 days after payment.


    1. installation&commissioning

    After the gallon bottling machine arrived at the customer's site. the customer is responsible for unpacking and arranging the equipment according to the placement drawing;Our technician will do equipment set up and commissioning,buyer should offer necessary help if needed


    2. Training

    We are responsible for offering the technical training to user.Through training,users' technical staff can grasp and the skill of operation and maintenance proficiently.The buyer also can send staff to our company for learning.


    3. Quality assurance

    The warranty period is 12 months after acceptance chech of the production line.if there is any different between the furnished equipment in the customer's factory and the equipment concerned in the contract.

    Quality Double Row Rinsing SUS304 300 BPH Gallon Water Plant for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Zhangjiagang City FILL-PACK Machinery Co., Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)